PeakExporterBuilding materials, architectural hardware, lighting, fit-out products, and construction supply lines for export buyers.
Prefab House Low Carbon Building Material Multi-Story Steel Structure Modular Homes Prefabricated Ho
Building Materials

Prefab House Low Carbon Building Material Multi-S | RFQ Sourcing Details

Building Materials · Quote on request

This is a product procurement detail page: check specs, images, category context and related sourcing paths before sending an RFQ.

Quote on request

Product specs

CategoryBuilding Materials
Unitset
CategoryBuilding Materials
AvailabilityInquiry required
Updated2026-05-31

Buyer's Digest

Use this page as a product-first sourcing checkpoint before sending an RFQ. Category: Building Materials. Confirm application fit, capacity, materials, destination, lead time and compliance requirements before comparing suppliers.

Original product description

Features: 1. Our building has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy,beautiftul appearance, short construction time, good efect of insulation, long using life, space-efficient, good seismic performance.

01 The shape of steel structure building is often more flexible and modern, the lines are simple and smooth, and it can easily realize a variety of complex design concepts to meet the aesthetic needs of personalized and artistic.

02 Because the steel structure components are mostly prefabricated in the factory, the site only needs to be assembled, which greatly shortens the construction period, reduces the noise, dust and other pollution to the surrounding environment, and also reduces the labor cost.

03 The interior of the building also has good thermal insulation, thermal insulation, sound insulation performance, through the use of new thermal insulation materials in the wall, roof and other parts, with reasonable structural design, can create a comfortable and quiet living environment for residents.

Item Materials Remark Steel Frame 1 H section column and beam Q345 steel, paint or galvanization 2 wind resistant column Q345 steel,paint or galvanization 3 Roof purline Q235B C/Z section galvanized steel 4 Wall purline Q235B C/Z section galvanized steel Supporting system 1 Tie bar Q235 round steel pipe 2 knee brace angle steel L50*4,Q235 3 roof horizontal bracing φ20,Q235B steel bar, paint or galvanized 4 column vertical bracing φ20,Q235B steel bar, paint or galvanized 5 purline brace Φ12 round bar Q235 6 knee brace angle steel, L50*4,Q235 7 casing pipe φ32*2.0,Q235 steel pipe 8 gable angle steel M24 Q235B Roof and wall protecting system 1 Wall and roof panel corrugated steel sheet/sandwich panel 2 self tapping screw 3 Ridge tile color steel sheet 4 gutter color steel sheet/galvanized steel/stainless steel 5 down pipe 6 corner trim color steel sheet 1.

Ding. Rui Yong. Cheng Construction Engineering Co., Ltd is a comprehensive construction company specializing in the design, production and installation of new prefabricated steel structures.

It has a wide range of product types and can undertake various engineering projects such as portal frames multi-layer frames, large-span space frame, livestock farms, light steel villas, container houses, etc 2. Dingrui Yongcheng has domestically advanced in

Prefab | Applications and Buyer Notes

Prefab is organized as a sourcing-ready Building Materials reference. The page combines visible product or company data with structured procurement cues so buyers can compare application fit, specifications, quantity, quality requirements and lead-time questio

Applications

  • Initial shortlist building for related product or supplier options.
  • Specification and application fit review before bulk purchasing.
  • Category, keyword and detail-page comparison before sending an RFQ.

Key specifications

Category
Building MaterialsBased on visible page data; confirm exact value in the RFQ.
Unit
setBased on visible page data; confirm exact value in the RFQ.

Buyer tips

  • State quantity range and split-delivery needs before price comparison.
  • Add certification, material or inspection standards when they affect acceptance.
  • For time-sensitive projects, include target arrival date and destination.
  • For special applications, describe operating condition, installation environment and duty cycle.

FAQ

What should buyers confirm first?

Confirm application, specification, quantity, destination and lead-time requirements before comparing offers.

Can buyers inquire when specs are incomplete?

Yes. Add model, material, size, use case and inspection needs in the RFQ to make replies comparable.

How should this listing be evaluated?

Check title, category, specifications and related keywords against the actual sourcing requirement.

Source mix: ugc

Key specifications

CategoryBuilding Materials
Unitset

Product sourcing keywords

These terms come from the title, visible copy and specifications, and link into matching aggregate pages.

Continue from this detail page into sourcing structure

These links connect the detail page back to category hubs, procurement aggregates and knowledge pages so new inventory is not isolated.

PeakExporter related sourcing paths

Related categories PeakExporter related paths
Related applications PeakExporter related paths
Related solutions PeakExporter related paths

PeakExporter related product samples